Client: Caltrans
TERM: 2006 TO 2014

ReversibleLane.png

KEY PROJECT COMPONENTS:

  • ICX provided the design, installation, integration and cut-over for a fully redundant operational control and surveillance system for 15 miles of I-15 access controlled reversible roadway
  • Simulator development that allows full simulation of system operations – used for testing and training
  • Operational since 2008
  • Upgrade of field control devices and corresponding TMC operational controls – first PLC implementation for Caltrans District 11